Product Image

Long Line Dog Lead - 3M 10M 20M 30M Training Leash for Dogs Reflective Recall Dog Training Leads with Soft Padded Handle, Strong Extra Long Lead Leash for Large Medium Small Dogs (Black, 10M)

£6.39

This product is ideal for households with medium to large-sized dogs that require a sturdy and long-lasting training leash.

Product Reviews

Name: Review: