Product Image

Sony DAV Surround Left Speaker Cable Blue Original Long Lead Tested Working

£9.99

Tested working. • Original DAV system lead. • Suitable for surround left speaker connection. • Genuine Sony speaker cable. • Transparent cable with blue connector. • Long cable length. • Tested working.

Product Reviews

Name: Review: