Sony DAV Surround Right Speaker Cable Grey Original Long Lead Tested Working
£9.99
Tested working. • Original DAV system lead. • Suitable for surround right speaker connection. • Genuine Sony speaker cable. • Transparent cable with grey connector. • Long cable length. • Tested working.